Discussion of: Ground Improvement Using Preloading with Prefabricated Vertical Drains

Bengt H. Fellenius

Cover Image

Abstract


 

Keywords


Ground improvement; immediate compression; consolidation settlement; secondary compression; wick drains; drain spacing; smear zone; preloading future maintenance

Citation


Fellenius, B. H. (2014). Discussion of: Ground Improvement Using Preloading with Prefabricated Vertical Drains, Vol. 3, Issue 2, p.67-72. doi: 10.4417/IJGCH-03-02-01




DOI: http://dx.doi.org/10.4417/IJGCH-03-02-01

Copyright © 2004-2018 Elxis s.a. All rights reserved. Powered by Argo-E LLC.